Greg Myers Construction logo
New single-story home with blue siding and a two-car garage

New Homes · Federal Way, WA

New Home Builder in Federal Way, WA

New Home Construction (Build on Your Land) in Federal Way. Work directly with Greg — call, text or get a free estimate.

Federal Way, King County and every town within 100 miles of Rainier

Swipe for more reviews →

Get a Free New Home Estimate in Federal Way

Free estimates. Fill out the form or call, and Greg will get right back to you.

  • Free estimates
  • Licensed, bonded & insured
  • 33 years of experience
  • Work directly with Greg

Fill out the form below to get your free estimate 👇

Rather talk? Call or text Greg: (360) 239-9840

New Home Construction (Build on Your Land) · Federal Way

New Home Construction (Build on Your Land) in Federal Way

People in Federal Way call Greg for new homes on your land, ramblers and two-story homes. He's a licensed, bonded and insured general contractor out of Rainier, about 35 miles away, and every Federal Way job starts with a free estimate.

In the older neighborhoods here, a lot of the work is remodels, additions, ADUs and decks on tight lots, built to the city's permit and inspection schedule. What you need is one builder who handles all of it and tells you the truth about cost and timing.

One customer called Greg “a man of integrity.” Another wrote that he “does excellent work.”

Craftsman home and matching detached garage on a gravel drive
Our crew's work

What's included

New Home Construction (Build on Your Land) we do in Federal Way

  • 01

    Proven floor plans

    Single-level ramblers, two-story family homes and ranch layouts that build efficiently, adjusted to your lot and your needs.

  • 02

    Lot evaluation

    Before you commit, Greg looks at access, slope and soil and where the house, driveway, well and drainfield can fit.

  • 03

    Site prep and foundation

    Clearing, excavation, grading and a concrete foundation, crawlspace or slab, poured for the soil on your lot.

  • 04

    Framing and dry-in

    Floors, walls and roof framed square, then roofing, house wrap, windows and doors to get the house weathertight.

  • 05

    Exterior finishes

    Lap, shingle or board-and-batten siding, stone accents, a covered entry and trim that suit the setting.

  • 06

    Interior finishes

    Drywall, flooring, cabinets, tile, doors and trim, finished to the standard you picked at the start.

King County, WA

New Home Construction (Build on Your Land) around Federal Way

Greg works all over Federal Way — near Redondo, Celebration Park and Steel Lake Park and out by The Commons at Federal Way and Indian Hill — and throughout King County.

Federal Way sits between Tacoma and Seattle on the I-5 corridor in south King County. Federal Way is about 35 miles northeast of our base in Rainier, well inside our 100-mile service area.

Western Washington buildings fight water more than anything — months of rain, moss on the roof, rot wherever wood stays wet, and soils that hold moisture. A building lasts when it sits on a proper foundation with drainage around it, is wrapped and flashed right, and is built to dry out.

Real work · not stock photos

Greg's new home construction (build on your land) work

Photos from Greg's own jobs around Western Washington.

  • New ranch home at the end of a long gravel drive in the trees
  • Craftsman custom home with stone-base columns and a cedar-shingle gable
  • New two-story home with a three-car garage and a fresh lawn
  • New two-story home with siding and roof on, ready for finish work
  • New single-story home with green lap siding and a two-car garage
  • New rambler with brown lap siding and a covered entry

How it works

How your Federal Way new home job works

  1. 1

    Free on-site estimate

    Greg visits your lot, talks through the house you want and flags anything about the site that affects the cost.

  2. 2

    Plan, price and permit

    We choose or adjust a plan, lock in finishes and pricing, and submit for the building permit.

  3. 3

    Build in order

    Site prep, foundation, framing, roofing, siding and interior work move in sequence, with updates from Greg along the way.

  4. 4

    Final inspection and keys

    The house passes final inspection, we walk it with you, finish any touch-ups and hand you the keys.

Customer reviews

What customers say about Greg

  • “He is a quality person to deal with and does excellent work. I would recommend him to anyone.”

    Don B.

    An addition to an existing structure · HomeAdvisor review

  • “He is a man of integrity. He does what he says and says what a does.”

    Tom W.

    A project with Greg · HomeAdvisor review

  • “He does good work.”

    Bill

    A project with Greg · HomeAdvisor review

Questions

New Home Construction (Build on Your Land) in Federal Way: FAQs

Do you do new home construction (build on your land) in Federal Way, WA?

Yes. Federal Way is about 35 miles northeast of our base in Rainier, well inside our 100-mile service area. Greg handles new homes on your land, ramblers and two-story homes there, and the estimate is free.

Do I need a permit for new home construction (build on your land) in Federal Way?

It depends on the project. When one is needed, Greg pulls the permit from the City of Federal Way's building department and builds to whatever the permit and inspection require.

Can I choose my own floor plan?

Yes. You can bring a plan, pick from proven rambler and two-story layouts, or adjust one to fit your lot and the way your family lives. If you want something fully one of a kind, Greg builds custom homes too.

How long does it take to build a new home?

It depends on the size of the home, how long permit review takes where you live, the season and how quickly finish selections are made. Greg lays out a schedule at the start and keeps you posted as each stage is done. Making your selections early is the best way to keep the job moving.

Does building on rural land in Western Washington take extra site work?

Often it does. Many lots here have glacial till or clay that drains poorly, a high water table in winter, or wetlands and slopes the county wants protected. We look at all of that up front, plan the drainage and foundation to suit, and schedule earthwork for drier stretches when we can. Getting the site right is what keeps a crawlspace dry year after year.

How much does it cost to build a new home on my land?

The size of the house, the plan and the finishes set most of the price, and the lot sets the rest. Clearing, a long driveway, grading and foundation work for poor soil can add a lot on rural land, while a ready lot in a neighborhood adds very little. Greg's free estimate comes after he has walked the lot, so the number covers the site work as well as the house.

More in Federal Way

Other services in Federal Way

Ready to start your Federal Way new home project?

Free estimates. Call, text or fill out the form.